SAP S4HANA里委外加工采购功能的变化

简介: SAP S4HANA里委外加工采购功能的变化

SAP S4HANA里委外加工采购功能的变化



【Part 1:主要变化点】



1.1,采购订单界面上的变化,

image.png






1.2, 新的事务代码: ME2ON (Subcontracting Cockpit),


image.png


image.png







1.3, 新的事务代码: ADSUBCON (Subcontracting Monitor)



image.png

image.png

image.png










【Part 2, 新旧事务代码之间的区别 】



2.1, 在ME2O和ADSUBCON,只会产生541移动类型的物料凭证号。



2.2, ADSUBCON is the newly defined transaction code which is provided as part of EP4 (Enhancement Package 4) recently by SAP to enhance the external refurbishment of MRO items using subcontract process. Basically, they are serving the same purpose (that is in support for subcontract process). However, ADSUBCON is a much more powerful transaction (than ME2O) as you can use it to convert subcontract PR into PO, stock transfer posting to your subcontractor as well as posting GR with reference to subcontract PO thereafter. It is considered as ''Subcontract Monitoring Cockpit'' transaction.



2.3, 而在ME2ON 事务代码里,可以实现2步法(movement type 30A)将子件库存转移过账到分包商库存里。



【Part 3, 两步法将子件转移过账到分包商库存】



如果要2步法来实现委外采购流程,大致的操作步骤如下:



1) 创建一个采购订单,ITEM Category设置为L,然后维护分包BOM;


2) 执行ME2ON事务代码,highlight the Component Line,点击'Create Delivery'按钮;


3) 在创建交货单提示界面里,将移动类型由541修改为30A。保存,创建交货单单据。


4) 为交货单拣配然后做发货过账。


5) 此时去看component part的库存,就能看到其库存处于状态'ST'(Stock for SC);


6) 一旦分包商说他完成了相关加工工序,我方可以执行MIGO + 30B O 将子件料号的特殊库存状态由'ST'变为'O'。


7) 等分包商将加工好的料号送到我方,我方就可以执行MIGO + 101为回收件料号做收货,同时消耗子件的库存。



移动类型30A和30B,


image.png

image.png






相关文章
SAP 库存类物资采购和消耗类物资采购区别
库存类物资采购和消耗类物资采购明明都是标准采购,那么他们的区别又在何处呢??
|
数据安全/隐私保护
SAP系统邮件功能配置
相信SAP顾问或多或少都会接到用户要求SAP系统能够定时发送邮件的功能,定时将用户需要的信息已邮件的方式发送给固定的人员。很多初级的小伙伴不知道该如何配置这个邮件功能,下面就来讲一下SAP发送邮件应该如何配置。
SAP系统邮件功能配置
SAP采购发票跨期冲销问题的解决方案
笔者在实际工作中用户反馈在月初做上月的采购发票冲销时,冲到了本月,造成供应商上期有余额,询问如何处理?解决后我把解决方案记录下供大家参考!!
SAP采购发票跨期冲销问题的解决方案
SAP WM 采购订单收货后LT06报错-Allowed storage unit types not defined for storage type Z03-
SAP WM 采购订单收货后LT06报错-Allowed storage unit types not defined for storage type Z03-
SAP WM 采购订单收货后LT06报错-Allowed storage unit types not defined for storage type Z03-
SAP WM 采购订单收货后LT06报错-No bin types have been assigned to storage unit type IP-
SAP WM 采购订单收货后LT06报错-No bin types have been assigned to storage unit type IP-
SAP WM 采购订单收货后LT06报错-No bin types have been assigned to storage unit type IP-
SAP QM初阶之启用了Multiple Specification功能后检验批的不同之处?
SAP QM初阶之启用了Multiple Specification功能后检验批的不同之处?
SAP QM初阶之启用了Multiple Specification功能后检验批的不同之处?
SAP QM初阶之事务代码QC51为采购订单创建Quality Certificate
SAP QM初阶之事务代码QC51为采购订单创建Quality Certificate
SAP QM初阶之事务代码QC51为采购订单创建Quality Certificate
SAP QM 采购订单收货时没有Vendor CoA就不让收货过账的实现
SAP QM 采购订单收货时没有Vendor CoA就不让收货过账的实现
SAP QM 采购订单收货时没有Vendor CoA就不让收货过账的实现
SAP QM Quality Certificate对于采购业务的控制
SAP QM Quality Certificate对于采购业务的控制
SAP QM Quality Certificate对于采购业务的控制
SAP WM 针对采购订单收货时候不能自动获取物料主数据里的Special Movement Indicator?
SAP WM 针对采购订单收货时候不能自动获取物料主数据里的Special Movement Indicator?
SAP WM 针对采购订单收货时候不能自动获取物料主数据里的Special Movement Indicator?