SAP BW实施项目包含哪些内容,需要跟R/3系统进行交互

简介:

What type of activities we perform in IMPLEMENTATION project? Will we start from modeling stage or interact with R/3?

Responsibilities of an implementation project

For ex, Lets say If its a fresh implementation of BI or for that matter you are implementing SAP.

First and foremost will be your requirements gathering from the client.  Depending upon the requirements you will creat a business blueprint of the project which is the entire process from the start to the end of an implementation.

After the blue print phase sign off we start off with the realization phase where the actual development happens. In our example after installing the necessary softwares, patches for BI we need to discuss with the end users who are going to use the system for inputs like how they want a report to look like and what are the Key Performance Indicators(KPI) for the reports etc., basically its a question and answer session with the business users.

After collecting those informations the development happens in the development servers.

After the development comes to an end the same objects are tested in quality servers for any bugs, errors etc., When all the tests are done we move all the objects to the production environment and test it again whether everything works fine.

The Go-Live of the project happens where the actually postings happen from the users and reports are generated based on those inputs which will be available as an analytical report for the management to take decisions.

The responsibilites vary depending on the requirement. Initially the business analyst will interact with the end users/managers etc., then on the requirements the software consultants do the development, testers do the testing and finally the go-live happens.

BW Data Architect Description: 
The BW Data Architect is responsible for the overall data design of the BW project. This includes the design of the:  
BW InfoCubes (Basic Cubes, Multi-cubes, Remote cubes, and Aggregates) » BW ODS Objects » BW Datamarts » Logical Models » BW Process Models » BW Enterprise Models 

The BW Data Architect plays a critical role in the BW project and is the link between the end user's business requirements and the data architecture solution that will satisfy these requirements. All other activities in the BW project are contingent upon the data design being sound and flexible enough to satisfy evolving business requirements.

Time Commitment 
– the time which must be committed to this Role to ensure the project requirements are met Project Complexity Time Commitment Low If the BW project utilizes standard BW content and InfoCubes, this role can be satisfied by the BW Application Consultant.

Medium  
If the BW project requires enhancements to the standard BW content and InfoCubes and/or requires the integration of non-SAP data, this role may require a committed resource.

High  
If the BW project requires significant modification and enhancement to standard BW content and InfoCubes, it is highly recommended that an experienced resource be committed full-time to the project.

Key Attributes 
The BW Data Architect must have: 
An understanding of the BW data architecture » An understanding of multidimensional modeling » An understanding of the differences between operational systems data modeling and data warehouse data modeling » An understanding of the end user's data » An understanding of the integration points of the data (e.g., customer number, invoice number) » Excellent troubleshooting and analytical skills » Excellent communication skills » Technical competency in data modeling » Multi-language skills, if an international implementation » Working knowledge of the BW and R/3 application(s) » Experience with Data Modeling application software (i.e., ERWIN, Oracle Designer, S-Designer, etc.) 

Key Tasks  
The BW Data Architect is responsible for capturing the business requirements for the BW project. This effort includes: 
Planning the business requirements gathering sessions and process » Coordinating all business requirements gathering efforts with the BW Project Manager » Facilitating the business requirements gathering sessions » Capturing the information and producing the deliverables from the business requirements gathering sessions » Understanding and documenting business definitions of data » Developing the data model » Ensuring integration of data from both SAP and non-SAP sources » Fielding questions concerning the data content, definition and structure 

This role should also address other critical data design issues such as: 
Granularity of data and the potential for multiple levels of granularity » Use of degenerate dimensions » InfoCube partitioning » Need for aggregation at multiple levels » Need for storing derived BW data » Ensuring overall integrity of all BW Models » Providing Data Administration development standards for business requirements analysis and BW enterprise modeling » Provide strategic planning for data management » Impact analysis of data change requirements As stated above, the BW Data Architect is responsible for the overall data design of the BW project. 

This includes the design of the: 
BW InfoCubes (Basic Cubes, Multi-cubes, Remote cubes, and Aggregates) » BW ODS Objects » BW Datamarts » Logical Models » BW Process Models » BW Enterprise Models

BW Project Implementation and Rollout

Global IDs uses a modified version of the ASAP methodology to ensure a robust BW environment is implemented, tested, and delivered. The project milestones include the following:

Blueprinting 
Realization 
Roll Out 
Post-Implementation Support 
Organizational Change Management 
BW Maintenance

*Phase 1: Upgrade Project Preparation -*

The purpose of this phase is to provide initial planning and preparation for your R/3 upgrade project. Although each upgrade project has unique objectives, scope and priorities, the steps in Phase 1 help identify and plan the primary topics that must be considered.

*Phase 2: Business Blueprint -*

The purpose of this phase is to establish a common understanding in your company about how the new R/3 release will handle your current business processes after the R/3 upgrade.

*Phase 3: Realization of DEV and QAS -*

The purpose of this phase is to perform the upgrade of all non-production R/3 Systems, which normally include development (DEV) and quality assurance 
(QAS) systems, and to ensure the quality of this upgrade process by comprehensive testing. You need to upgrade your DEV and QAS systems before performing the upgrade for your production system (PRD). Furthermore, you will develop your end user documentation and training in this phase.

*Phase 4: Realization of Production -*

The purpose of this phase is to complete the final preparation for the upgrade of the production R/3 System, and end user training, if necessary.  On the successful completion of this phase, you are ready to run your business in your upgraded production R/3 System.

*Phase 5: Go Live and Support -*

The purpose of this phase is the transition from your previous R/3 System to a newly upgraded and improved R/3 System. Be aware that you must set up an ongoing support organization to service your R/3 users, both during the first few days of your upgraded production operations, and on an ongoing basis.

专注于企业信息化,最近对股票数据分析较为感兴趣,可免费分享股票个股主力资金实时变化趋势分析工具,股票交流QQ群:457394862
分类:  SAP BI

本文转自沧海-重庆博客园博客,原文链接:http://www.cnblogs.com/omygod/archive/2011/12/16/2290227.html,如需转载请自行联系原作者
目录
相关文章
|
5月前
|
Java Maven
SpringBoot项目接入Jco调用SAP接口遇到的问题
在SpringBoot项目中接入SAP接口通过Jco时遇到两个主要问题。首先,Jco不允许重命名或重新打包"sapjco3.jar",解决方案是将jar安装到本地和服务器的Maven仓库,配置pom.xml避免打包,并在服务器上更新环境变量。其次,调用后需释放`DestinationDataProvider`以防止异常。此外,调用SAP函数的步骤包括设置入参、执行和获取结果,涉及字段、结构和表类型的数据操作。
359 0
|
6月前
|
数据库
SAP系统不能启动解决方案
SAP系统不能启动解决方案
247 1
|
6月前
|
Unix
SAP R/3系统的启动和关闭
SAP R/3系统的启动和关闭
83 1
|
6月前
|
Oracle 关系型数据库 Unix
SAP系统拷贝 UNIX + Oracle
SAP系统拷贝 UNIX + Oracle
53 1
|
运维 小程序 Unix
SAP 关于一些日常运维用到的系统小程序
主要介绍处理一些系统数据,或者查询日志用到的小工具程序或函数
234 0
|
数据库
SAP ABAP——学生信息系统demo
本文是一个ABAP学生信息系统的demo,废话不多说直接看demo场景
198 0
SAP ABAP——学生信息系统demo
|
SQL JavaScript 前端开发
浅谈 SAP ABAP 系统里的 ALV 输出方式实现
浅谈 SAP ABAP 系统里的 ALV 输出方式实现
626 3
浅谈 SAP ABAP 系统里的 ALV 输出方式实现
|
数据安全/隐私保护
SAP系统邮件功能配置
相信SAP顾问或多或少都会接到用户要求SAP系统能够定时发送邮件的功能,定时将用户需要的信息已邮件的方式发送给固定的人员。很多初级的小伙伴不知道该如何配置这个邮件功能,下面就来讲一下SAP发送邮件应该如何配置。
SAP系统邮件功能配置
SAP BASIS如何查询指定的用户在SAP系统上做了哪些操作?
SAP BASIS如何查询指定的用户在SAP系统上做了哪些操作?
SAP BASIS如何查询指定的用户在SAP系统上做了哪些操作?
SAP QM 创建ROS维护检验工序,系统报错:Work center NMDC_QA plant NMDC does not exist for task list type S
SAP QM 创建ROS维护检验工序,系统报错:Work center NMDC_QA plant NMDC does not exist for task list type S
SAP QM 创建ROS维护检验工序,系统报错:Work center NMDC_QA plant NMDC does not exist for task list type S
下一篇
无影云桌面