Make-to-Order Production (20)

简介: Make-to-Order Production (20)  面向订单生产(20) Purpose In make-to-order production, a product is produced specifically for an individual sales order.

Make-to-Order Production (20) 

面向订单生产(20

Purpose

In make-to-order production, a product is produced specifically for an individual sales order. This planning strategy is used when planning of the (parent) product is not required or not possible. Neither Demand Management is involved in this process, nor is there an allocation mechanism. Orders are taken as they come. This strategy represents a production procedure in which each product is only produced once, although over time the same or similar production processes are repeated. Each product is specifically produced for an individual customer so that the finished product is rarely placed in stock.

在面向订单生产中,产品是专门为单个销售订单生产的。当产品的计划不需要或不能做的时候,使用这个策略。无论是这个进程涉及的需求管理,还是分配机制。订单被执行当它们来临。这个策略描绘了一个每件产品仅仅被生产一次的生产过程。尽管随着时间的推移,相同或类似的生产过程被重复进行。因为每件产品专门为个别客户生产,所以很少有成品库存。

 

Prerequisites 前提条件

 

You have the following two options. 你有下面的两个选项。

Be able to do the following:能够做到下面几点:

    • Procure all necessary components within the total replenishment lead time 采购总补货时间内所有必需的组件
    • Plan on component level 在部件层计划
    • Use consumption-based components or Kanban-based components使用基于消耗的的物料或者基于看板的物料
  • Receive the sales orders at a very early stage with regard to the replenishment lead time.相对于补货提前期较早的阶段收到销售订单。

You also must maintain the following master data settings for the finished product:你也必需为成品维护下面的数据配置

  • Strategy group 20 on the MRP screen MRP视图设置策略组为20
  • Item category group (such as NORM) on the Sales Organization screen 销售组织视图中的项目分类组(例如NORM

No specific product structure is required. This means it does not matter if the material has a BOM (internal production) or not (and is procured externally). The material is, however, usually produced in-house as in the subsequent sample scenario.没有具体的产品结构是必需的。这意味着它并不重要,如果物料有一个BOM(内部生产)或没有(外部采购)。然而,在随后的示例场景中,物料通常在内部生产。

Process Flow 业务流程

 

For a detailed example of the entire process, see Sample Scenario: Strategy 20.整个过程的详细示例,见示例场景:20策略。

  1. The sales order quantities are planned for production using the sales order number. The quantities produced for the individual sales orders cannot be changed. Each quantity is maintained specifically for the individual sales order. A separate segment is created in the MRP list for make-to-order production. 销售订单的数量为生产被计划使用用销售订单号。为个别销售订单的生产数量不能更改。每个数量专门为单个销售订单保持。在MRP清单中,为了面向订单生产,一个单独的段被创建。
  2. Starting from the sales order, you can apply this type of planning to as many levels of the BOM as you want. Assemblies and components are produced or procured specifically for the pegged order and stock is managed separately for this sales order. 从销售订单开始,你能运用这个类型的计划到你想要的尽可能多的BOM层次,组件和部件专门为这个固定的订单生产或采购,而且库存也是为这个销售订单单独管理的。

The production and procurement costs are maintained for each sales order in either a settlement order or in a project at sales order item level. This ensures a detailed analysis of the planned and actual costs. 每个销售订单的生产和采购成本记录在一个结算订单里面或在一个项目中在销售订单项目层次。这确保了详细的计划和实际成本分析。

You can also use this production technique to create "assembly orders." The assembly order triggers the creation of a production order or of a planned order and provides you with a precise delivery schedule. The delivery schedule is based on availability and the production requirements of the relevant assemblies and components.你也可以使用这种生产技术创建“装配订单”,装配订单触发生产订单和计划订单的创建,并提供给你一个准确的交货计划,交货计划是基于相关组件和部件的可用性和生产需求上的。

Other Areas 其它区域

Stocking Level 库存层级

See Stockkeeping at Different BOM Levels for more information.更多的信息,见不同BOM层级的存货

Availability Check 可用性检查

There are no major factors to consider when maintaining the material master of the finished product. See Availability Check. 维护成品物料主数据的时候没有主要的因素需要考虑,见可用性检查。


目录
相关文章
|
5月前
|
Python
pip安装包报错Could not find a version that satisfies the requirement pymysql (from versions: none)
pip安装包报错Could not find a version that satisfies the requirement pymysql (from versions: none)
238 1
|
Ubuntu Unix Linux
成功解决ERROR: Unable to find the development tool `cc` in your path; please make sure that you have the
成功解决ERROR: Unable to find the development tool `cc` in your path; please make sure that you have the
成功解决ERROR: Unable to find the development tool `cc` in your path; please make sure that you have the
|
5月前
|
Python
Python安装库Could not find a version that satisfies the requirement requests (from versions: none)
Python安装库Could not find a version that satisfies the requirement requests (from versions: none)
如何解决 conda install 库时报错:The environment is inconsistent, please check the package plan carefully
如何解决 conda install 库时报错:The environment is inconsistent, please check the package plan carefully
如何解决 conda install 库时报错:The environment is inconsistent, please check the package plan carefully
编译OpenJDK11:configure: error: Target CPU mismatch. We are building for x86_64 but CL is for “版“; exp
编译OpenJDK11:configure: error: Target CPU mismatch. We are building for x86_64 but CL is for “版“; exp
130 0
configure: error: C compiler cannot create executables
configure: error: C compiler cannot create executables
282 0
configure: error: Library requirements (libpcre >= 7.8) not met
configure: error: Library requirements (libpcre >= 7.8) not met
98 0
configure: error: Package requirements (commoncpp 6.2.2) were not met
configure: error: Package requirements (commoncpp 6.2.2) were not met
61 0
|
Ubuntu Unix Linux
成功解决ERROR: Unable to find the development tool `make` in your path; please make sure that you have t
成功解决ERROR: Unable to find the development tool `make` in your path; please make sure that you have t
成功解决ERROR: Unable to find the development tool `make` in your path; please make sure that you have t